Active Project · Winnipeg, Manitoba
Planning Underway

TwinRail Industrial
225 Acres · CentrePort Canada

A transformative rail-served industrial development at Canada's largest inland port. Located within the CentrePort Canada Special Planning Area, with municipal services committed within two years.

225
Total
Acres
180
Rail-Served
Industrial Acres
$170M
Total Project
Cost
12–15
New Industrial
Shippers

Winnipeg's Next
Industrial Frontier.

The TwinRail Logistics Park is a 225-acre industrial development anchored within CentrePort Canada — Canada's largest tri-modal inland port — at the intersection of all four major national trade gateways.

The site provides direct access to both CN and CPKC Class I rail lines and is designated within the Inland Port Special Planning Area, enabling streamlined approvals. The 225-acre footprint unlocks approximately 180 acres of rail-served, developable industrial land for 12 to 15 export-oriented industrial shippers.

Planning is actively underway and the Rural Municipality of Rosser has committed to providing full municipal services within the next two years.

Total Land Area
225 Acres
Rail-Served Industrial
180 Acres
Location
CentrePort Canada
RM of Rosser, Manitoba
Designation
Industrial / Special Planning Area
Rail Access
CN + CPKC (Class I)
Municipal Services
Committed — 2 Years
Total Project Cost
$170 Million
Permitting Timeline
<12 Months
Project Timeline

Development Milestones

Land Acquired
225 acres fully acquired and designated for industrial use
Completed
Site Designation
Inland Port Special Planning Area — streamlined approvals
Completed
Early Engineering
Water & wastewater infrastructure design completed, ready to proceed
Completed
Planning & Approvals
Municipal planning underway — RM of Rosser services committed within 2 years
In Progress — 2025/26
5
Permitting & Subdivision
Expected <12 months once approvals confirmed
Est. 2026/27
6
Shovel Ready
Rail & road infrastructure construction commences
Est. 2027+
Site Configuration

Conceptual Plan
Key Metrics

The conceptual plan (by JAS) shows industrial lots ranging from 10 to 20 acres, rail-served by the CN Lilyfield Spur and CPKC Carberry Sub-Division, with a dedicated transload facility and railcar storage area. Subject to engineering review and final approvals.

225
Total Acres
Full site encompassing industrial lots, roadways, rail corridors, and the transload facility area. Located on Rosser Road (PR 221) at Sturgeon Road, adjacent to Park Royale Way.
180
Rail-Served Industrial Acres
Net developable industrial land. Lot sizes range from 10 to 20 acres — sized for heavy industrial and logistics users requiring direct rail access.
10.8 mi
New Rail Track Created
Includes CN Lilyfield Spur extension, CPKC Carberry Sub-Division connections, Twin Rails track, PRS Track, and new road access of approximately 5,488 ft.
700
Railcar Storage Capacity
Dedicated transload facility, railcar storage, and Class Tracks. A common-use cross-dock facility is planned for future phases, expanding utility for SME shippers.
12–15
Export-Oriented Shippers
Site designed to support 12–15 new industrial shippers. Supports SMEs by lowering barriers to rail access — the "5 minutes to 55 mph" advantage via CentrePort Canada Way.
<12 mo
Permitting & Subdivision Timeline
Located within the Inland Port Special Planning Area — streamlined approvals pathway. Highway design study by CentrePort Canada Inc. expected Fall 2026, enabling coordinated roadway planning.
Infrastructure Advantage

Dual Class I Rail Access —
CN & CPKC

🚂

CN Rail — Lilyfield Spur

Direct CN access via the Lilyfield Spur, connecting to CN's national network spanning from the Port of Prince Rupert and Port of Vancouver to eastern seaports. Enables CN-routed export to Pacific and Atlantic gateways.

🚂

CPKC — Carberry Sub-Division

Direct CPKC access via the Carberry Sub-Division. CPKC's network connects to the Pacific Gateway, Port of Churchill (north), and Mid-Continent Corridor into Mexico — providing route optionality beyond U.S.-dependent corridors.

🏭

Transload & Value-Added Logistics

The site includes a dedicated Transload Facility and Railcar Storage area, enabling transloading, manufacturing, and value-added logistics operations. Supports agri-food, manufacturing, mining, and e-commerce sectors.

Winnipeg sits at the intersection of all four major Canadian trade gateways. TwinRail's dual-railway access allows shippers to route cargo west to the Prairie & Pacific Gateway (Vancouver, Prince Rupert), east to the Port of Montreal, north to the Port of Churchill, and south through the Mid-Continent Corridor into Mexico — reducing dependency on any single corridor and strengthening supply chain resilience.

Why Invest

The Investment Case

Shovel-Ready at Canada's Busiest Inland Port

The land is fully acquired, designated industrial, and sits within the Inland Port Special Planning Area — providing a streamlined approvals pathway that significantly reduces regulatory risk and timeline versus greenfield sites.

Municipal Services Committed

The Rural Municipality of Rosser has committed to providing full municipal services (water, wastewater) within two years — a critical de-risking milestone that confirms infrastructure readiness for industrial occupiers.

Strategic CentrePort Positioning

Located within Canada's largest tri-modal inland port, the site benefits from established multimodal infrastructure, an active industrial ecosystem of 1,000+ companies, and proximity to over $1.5 billion in existing private sector investment.

Unique Dual Class I Rail Advantage

TwinRail is the only site in Manitoba offering simultaneous access to both CN and CPKC Class I railways on a single parcel. This provides shippers with routing flexibility, competitive freight pricing, and supply chain redundancy.

Strong Industrial Demand Backdrop

Winnipeg's industrial market vacancy sits at 2.5%–3.1% with positive net absorption. Northwest Winnipeg — where CentrePort is located — is the strongest-performing submarket, driven by user demand for modern, large-bay industrial space with logistics access.

Proven Gridpoint Track Record in Winnipeg

Gridpoint has an established presence at CentrePort Canada, including the adjacent Sturgeon Win LP land holdings. The management team has deep familiarity with the regulatory environment, municipality, and market participants in this specific corridor.

Investor Access

Interested in
This Project?

This project is available to qualified investors who have completed our onboarding process. Contact our investor relations team to receive the full project brief and discuss participation options.

Contact Investor Relations View All Active Projects